SUMMARY OF PERFORMANCE ANALYSIS



AHMAD MALIKI OMAR

Head

Green Energy Research Centre

UiTM

Shah Alam

SYSTEM 1

SYSTEM 2

SYSTEM 3

Type of system : Single-phase

Type of system : Three-phase

Type of system : Single-phase grid connectd photovoltaic power system

Date of commisioning: 17th April 2012

Date of commisioning: 17th April 2012

Date of commisioning: 3rd June 2011

Type of mounting structure:

Type of mounting structure:

Type of mounting structure:

Retroffited on metal deck

Retroffited on metal deck

Free standing on concrete roof

Titl angle and orientation:

Titl angle and orientation:

Titl angle and orientation:

10 Deg facing South-East

10 Deg facing South-East

10 Deg facing South-East

PV Module

PV Module

PV Module

Type of module:

Yingli YL235P-29b (Polycrystalline)

Type of module:

Yingli Panda 250Wp YL250C-30b (Monocrystalline)

Type of module: Kaneka K60 (Amorphous Thin film)

Electrical characteristics:

Electrical characteristics:

Electrical characteristics:

PV array configuration:

PV array configuration:

PV array configuration:

Old configuration:

Port A: Series : 13

Parallel :1

Port B: Series :13

Parallel : 1

Old configuration:

Port A: Series : 20

Parallel :1

Port B: Series :20

Parallel : 1

Series : 3

Parallel :5

Total array power: 0.9 kWp

Total PV array : 6 kWp

Total PV array : 10 kWp

New configuration start from 8th Nov 2013

New configuration start from 8th Nov 2013

Port A: Series : 18

Parallel :1

Port B: Series :18

Parallel : 1

Port A: Series : 12

Parallel :1

Port B: Series :11

Parallel : 1

Total PV array : 9 kWp

Total PV array : 5.405 kWp

Inverter : SB 5000TL-20

Inverter : STP8000TL-10

Inverter : SB1200

Note : Sensorbox failure on February 2017

END OF DOCUMENT